Quality and documents

Quality, inspection and documents

MSE checks every order against the drawing number and revision before work starts, inspects parts against your drawing on a surface table with digital and vernier height gauges, and checks run-out on ground shafts. On repairs we work to your quality control plan (QCP), stage by stage. Tell us at quote stage which documents you need, and the quote will say which we supply.

Last updated:

How we check

CheckWhenHow
Drawing and revisionWhen the order arrives, before the first cutThe order is checked against the drawing number and revision. If they differ, we ask you to confirm in writing
DimensionsBefore deliveryAgainst your drawing, on a surface table with digital and vernier height gauges, angle plates and V-blocks
Shaft run-outAt grindingRun-out checked; shafts straightened on a hydraulic press where needed
Your QCPAt each hold point, mainly on repairsSigned off stage by stage
DeviationsBefore deliveryRaised through your concession process
Long-bed cylindrical grinder with a long steel shaft held between centres beside the grinding wheel
Cylindrical grinding of a long shaft, MSE works, Germiston

Documents

DocumentWho issues itWhen
Inspection report of drawing size against measured size; run-out and straightening records for shaftsMSEAsk at quote stage: the quote says which we supply
Mill material certificate, EN 10204 3.1, or 3.2 where the mill issues oneThe steel mill, passed on by MSEWhen the order requires it and the mill provides it
Heat-treatment certificateThe heat treater, passed on by MSEWhen the order requires it
QCP sign-offMSE, on your formWhen you supply a QCP

Ask at quote stage. The certificate you need changes the material we buy.

Questions buyers ask

Does MSE supply material certificates?

Yes, when the order requires them and the mill provides them: EN 10204 3.1, or 3.2 where the mill issues one. Say so at quote stage, because it changes the material MSE buys.

Can you supply an inspection report?

Ask at quote stage. Tell MSE which documents you need, such as an inspection report of each drawing size against the measured size, and the quote will say which MSE supplies. Mill and heat-treatment certificates are passed on when the order requires them.

Do you check the drawing revision?

Yes. MSE checks every order against the drawing number and revision before work starts, and asks you to confirm in writing if they differ.